You use this with the 20.09 full control joint, not on its own. Alternate them course by course - full, half, full, half - so the movement joint runs as one straight vertical line all the way up the wall while the blockwork either side stays properly bonded. Buy them in matched quantities.
Key Features
- Half-length partner to the 20.09 full control joint
- Keeps the movement joint dead vertical through every course
- Maintains running bond either side of the joint
- Supplied 72 per pallet to match the full block one-for-one
- Interlocking sash profile transfers lateral load across the joint
- Half-pallet (36) available
Specifications
- Material: Concrete
- Dimensions: 190 x 190 x 190mm
- Weight: 9kg each
- Pallet quantity: 72 units
- Manufactured to AS/NZS 4455.1
You use this with the 20.09 full control joint, not on its own. Alternate them course by course - full, half, full, half - so the movement joint runs as one straight vertical line all the way up the wall while the blockwork either side stays properly bonded. Buy them in matched quantities.
Key Features
- Half-length partner to the 20.09 full control joint
- Keeps the movement joint dead vertical through every course
- Maintains running bond either side of the joint
- Supplied 72 per pallet to match the full block one-for-one
- Interlocking sash profile transfers lateral load across the joint
- Half-pallet (36) available
Specifications
- Material: Concrete
- Dimensions: 190 x 190 x 190mm
- Weight: 9kg each
- Pallet quantity: 72 units
- Manufactured to AS/NZS 4455.1
Delivery Direct To Site
A delivery charge of $125 (incl. GST) applies to orders under 3 tonnes, with extra freight charged outside the local metro area depending on distance and load weight.
Pallets must be collected after delivery.